The bridge over the Tamarack River is finished except for paving, which they will do on Friday, Aug. 11, and the road will be reopened on Monday, Aug. 14. Fire trucks and responders will be allowed to cross now if on a 911 call. Photos: https://photos.app.goo.gl/rs33GNdpfyi8C6rV8
